{"id":7058,"date":"2018-11-08T16:36:56","date_gmt":"2018-11-08T15:36:56","guid":{"rendered":"https:\/\/www.pv-invest.com\/en\/?p=1341"},"modified":"2020-04-01T16:47:51","modified_gmt":"2020-04-01T14:47:51","slug":"pv-invest-issues-two-new-corporate-bonds","status":"publish","type":"post","link":"https:\/\/pv-invest.com\/en\/pv-invest-issues-two-new-corporate-bonds\/","title":{"rendered":"<span class=\"icon_building\"><\/span> PV-Invest issues two new corporate bonds"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;3.22&#8243;][et_pb_row admin_label=&#8221;row&#8221; _builder_version=&#8221;3.25&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;3.25&#8243; custom_padding=&#8221;|||&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text _builder_version=&#8221;4.4.1&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; hover_enabled=&#8221;0&#8243; use_border_color=&#8221;off&#8221;]<strong>Klagenfurt, November 8th, 2018. The PV-Invest GmbH based in Klagenfurt issues new corporate bonds. The drawing start is the November 12th, 2018.<\/strong><\/p>\n<p>PV-Invest GmbH, based in Lakeside B07, 9020 Klagenfurt, Austria, issues new corporate bonds. The total volume of the issue is up to 15 million euros. The volume is divided to two new bonds with seven-year maturity and a fixed interest rate of 4.15% and a ten-year period with a fixed rate in the amount of 4.5% in equal parts. The denomination is 1,000 euros per bond.<\/p>\n<p>The issue is based on the securities prospectus which has been published and approved on November 6th, 2018 by the Commission de Surveillance du Secteur Financier in Luxembourg (CSSF) and notified to the Finanzmarketaufsicht (\u201cFMA\u201d), the Bundesanstalt f\u00fcr Finanzdienstleistungsaufsicht (\u201cBaFin\u201d) and the Hungarian Magyar Nemzeti Bank (\u201cMNB\u201d).<\/p>\n<p>The securities prospectus and the bond conditions are available free of charge on the website of PV-Invest GmbH (www.pv-invest.com) and at PV-Invest GmbH, Lakeside B07, 9020 Klagenfurt.<\/p>\n<p><strong>Affected titles:<\/strong><br \/>\nDE000A1885U8; DE000A189CF6; AT0000A1YY22; AT0000A1YY14;<\/p>\n<p><strong>Released by:<\/strong><br \/>\nPV-Invest GmbH<br \/>\nLakeside B07<br \/>\n9020 Klagenfurt<br \/>\nAustria<\/p>\n<p><strong>Media &#038; Investor Relations<\/strong><br \/>\nRichard Petz<br \/>\nPV Invest GmbH<br \/>\n+43 (0) 463 \/ 218073 \u2013 21<br \/>\nrichard.petz@pv-invest.com<\/p>\n<p>This notification is a mandatory notification under Article 17 of the Market Abuse Regulation (MAR). It constitutes a marketing communication within the meaning of the Wertpapieraufsichtsgesetz (WAG) and the Kapitalmarktgesetz (KMG), but neither a financial analysis nor a financial advice or recommendation, nor an offer.[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Klagenfurt, November 8th, 2018. The PV-Invest GmbH based in Klagenfurt issues new corporate bonds. The drawing start is the November 12th, 2018.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[83,81,82,49],"tags":[],"class_list":["post-7058","post","type-post","status-publish","format-standard","hentry","category-ad-hoc-news","category-allgemein","category-press-releases","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/pv-invest.com\/en\/wp-json\/wp\/v2\/posts\/7058","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pv-invest.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pv-invest.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pv-invest.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/pv-invest.com\/en\/wp-json\/wp\/v2\/comments?post=7058"}],"version-history":[{"count":0,"href":"https:\/\/pv-invest.com\/en\/wp-json\/wp\/v2\/posts\/7058\/revisions"}],"wp:attachment":[{"href":"https:\/\/pv-invest.com\/en\/wp-json\/wp\/v2\/media?parent=7058"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pv-invest.com\/en\/wp-json\/wp\/v2\/categories?post=7058"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pv-invest.com\/en\/wp-json\/wp\/v2\/tags?post=7058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}