Hydro Power Plant Grabovica

The bottleneck capacity of the Grabovica plant is 249 kilowatts (kW). The power plant is connected to the local 10 KV medium-voltage grid of the Bosnian electricity supplier Elektro Privreda.

Installed technology

The heart of the Grabovica small hydropower plant is a Francis turbine with a bottleneck capacity of 249 kW.

Location

Country: Bosnia and Herzegovina
Region: Vraneševići
Nearest town: Bratunac
Connected to local Elektro Privreda electricity grid
GPS coordinates: 44°6‘8.8“ N, 19°28’37.7“ E

Technology

Francis Turbine

=

Bottleneck capacity

249 kW

=

EPC contractor

Green Energy-R

=

Commissioning

May 2019

Bottleneck capacity in kW