Hydro Power Plant Grabovica
The bottleneck capacity of the Grabovica plant is 249 kilowatts (kW). The power plant is connected to the local 10 KV medium-voltage grid of the Bosnian electricity supplier Elektro Privreda.
Installed technology
The heart of the Grabovica small hydropower plant is a Francis turbine with a bottleneck capacity of 249 kW.
Location
Country: Bosnia and Herzegovina
Region: Vraneševići
Nearest town: Bratunac
Connected to local Elektro Privreda electricity grid
GPS coordinates: 44°6‘8.8“ N, 19°28’37.7“ E
Technology
Francis Turbine
Bottleneck capacity
249 kW
EPC contractor
Green Energy-R
Commissioning
May 2019