Hydro Power Plant Grabovica

The bottleneck capacity of the Grabovica plant is 249 kilowatts (kW). The power plant is connected to the local 10 KV medium-voltage grid of the Bosnian electricity supplier Elektro Privreda.

Installed technology

The heart of the Grabovica small hydropower plant is a Francis turbine with a bottleneck capacity of 249 kW.

Location

Country: Bosnia and Herzegovina
Region: Vraneševići
Nearest town: Bratunac
Connected to local Elektro Privreda electricity grid
GPS coordinates: 44°6‘8.8“ N, 19°28’37.7“ E

Technology

Francis Turbine

=

Bottleneck capacity

249 kW

=

EPC contractor

Green Energy-R

=

Commissioning

May 2019

Bottleneck capacity in kW

PV-Invest GmbH
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.