Hydro power plant Zeleni Jadar

The bottleneck capacity of the Zeleni Jadar power plant is 249 kilowatts (kW). The power plant is connected to the local 10 KV medium-voltage grid of the Bosnian electricity supplier Elektro Privreda.

Installed technology

The heart of the Zeleni Jadar small hydropower plant is a Kaplan turbine with a bottleneck capacity of 249 kW.

Location

Country: Bosnia and Herzegovina
Region: Vlasenica
Nearest town: Bratunac
Connected to local Elektro Privreda electricity grid
GPS coordinates Zeleni Jadar: 44°04’35.5″N 19°15’39.2″E

Technology

Kaplan Turbine

=

Bottleneck capacity

249 kW

=

EPC contractor

Green Energy-R

=

Commissioning

January 2020